Manage Tags
Option required
Requires the COMMENT option to be enabled on the project.
Project-scoped tags are managed from a dedicated project screen. This feature covers the creation, renaming, and deletion of tags in both catalogs:
- Tag (Operations) — used by participant comments.
- Tag (Preparation) — used by preparation comments.
The two catalogs are independent: creating a tag in Operations does not create it in Preparation, and vice-versa. The workflow, constraints, and roles described below apply identically to both.
Objects used
Allowed roles
PROJECT_ADMINPROJECT_MANAGER
Other roles can use tags on their comments (create/edit comments with existing tags) but cannot create, rename, or delete tags.
Constraints
Create tag
- Tag name is required and must be unique within the project (case-insensitive).
- Initial comment count is
0.
Rename tag
- New name must be unique within the project.
- Existing comments keep their association (the tag is the same entity; only its label changes).
Delete tag
- Deleting a tag detaches it from every comment that carries it.
- The action is irreversible.
- If the tag still has a non-zero comment count, a confirmation is required.
Workflow
INFO
Access to the project scope is automatically gated by the authentication profile check.